Home

  About Us

  Our Products

      Solution Overview

      Solution Suite

           Audit Management

           CAPA

           Complaint Handling

           Design Control

           Document Control

           Nonconforming Materials

           Training Management

           Calibration and

             Preventive Maintenance

      Benefits to Customers

      Product Brochures

  Customer Profiles

  Partners

  Support Materials

  Contact Us

                                                     

Module Highlights:  Design Control

  • Model and manage the design process for your company
    • Sequence of Named Phases
  • Assign a Project Manager for each project
  • Initiate work assignments to people regarding the deliverables
  • Append files, information and evidence to the deliverables within each phase
  • Document reviews within each phase as needed:
    • Technical reviews
    • Deliverable reviews
    • Projects reviews
  • Conduct electronic phase review and approval when deliverables are completed in a phase
  • Define and maintain the electronic Design History File (DHF) online in real time
  • Measure and track project and phase status
  • Send tasks and emails automatically to individuals informing them of work to do
  • Maintain all information along with the associated reviews and approvals online by project
  • Part of an integrated suite of modules that provide a robust quality management system including Corrective Action (CAPA), Complaint Handling, Nonconforming Materials (NCM), Document Control and Training Management

  Design Project Example: Deliverables in Phase I Concept Analysis

Screen Capture:  Deliverables in Phase 1 Concept Analysis

The Project ID and Project Description at the top of this page provide information to the Project Manager about this specific project.  The tabs below that show the phases of this project.  The Project Manager can easily navigate from one phase of the project to another by clicking on the different tabs.

The tab for Phase 1 is currently selected in the screen capture.  The middle and lower portions of the screen show the deliverables in Phase 1.  The Status column indicates whether work has been done or is still ongoing for each deliverable.  Documentation that has been uploaded for a deliverable is shown on the right side of the screen in the Deliverables table.

 

 



Copyright (c) 2003-2010, Grand Avenue Software, Inc. All rights reserved.  Grand Avenue Software